Building Permits in Toronto, ON

Toronto's building permit process is managed by the Toronto Building division. Whether you're finishing a basement, building a deck, or creating a secondary suite, understanding the permit requirements before you start can save you thousands of dollars and months of delays.

Planning a renovation in Toronto?

Check if your project needs a permit — personalized to your address and zoning.

Check My Property

Key Facts

  • Toronto Building processes over 30,000 building permits annually
  • Most residential permits are reviewed within 10–15 business days
  • Permit fees are calculated based on project type and area in square metres
  • Heritage properties and conservation areas may have additional requirements

Permit Types

Deck & Porch Permits

$198 - $600 CAD10 business days

Building, replacing, or modifying a deck or porch requires understanding local zoning setbacks, height limits, and building code requirements.

Fence Permits

$0 - $400 CADImmediate to 10 business days

Fence regulations vary by zone, yard location, and height. Pool enclosure fences have specific safety requirements under provincial building codes.

Shed & Accessory Structure Permits

$198 - $400 CAD10 business days

Sheds, cabanas, and other accessory structures may or may not need permits depending on size, height, and placement on your property.

Basement Apartment Permits

$206 - $2,000+ CAD15-20 business days + inspections

Converting a basement into a legal secondary suite involves building code compliance, fire separation, egress requirements, and zoning approval.

Interior Renovation Permits

$206 - $1,500 CAD5-10 business days

Kitchen, bathroom, load-bearing wall, plumbing, and electrical renovations may require permits depending on the scope of work.

Swimming Pool & Hot Tub Permits

$206 - $1,200 CAD10-15 business days

In-ground and above-ground pools, hot tubs, and spas have specific permit, enclosure, and safety requirements.

Garage & Carport Permits

$198 - $800 CAD10-15 business days

Building a new garage or carport involves zoning setbacks, lot coverage limits, and building code requirements.

Roofing & Re-roofing Permits

$0 - $600 CAD5-10 business days

Roof replacement with the same materials may not need a permit, but structural changes, additions, or material changes often do.

Common Renovation Scenarios

Frequently Asked Questions

How do I apply for a building permit in Toronto?

You can apply online through the City of Toronto's online permit application portal, or in person at one of the Toronto Building customer service counters. Most residential projects can use the simplified "fast-track" application for smaller scopes of work.

How long does it take to get a building permit in Toronto?

Simple residential permits (decks, sheds, fences) are typically reviewed within 10 business days. More complex projects like basement suites or major renovations may take 15–20 business days. Heritage properties can add additional review time.

What happens if I do work without a permit in Toronto?

Building without a required permit can result in stop-work orders, fines, and orders to remove or redo the work. You may also face issues when selling your home, as unpermitted work must be disclosed and can reduce property value.

Do I need a permit for cosmetic renovations in Toronto?

Cosmetic changes like painting, wallpapering, installing flooring, replacing kitchen cabinets (without moving plumbing), and similar non-structural work do not require building permits. However, any work involving structural, plumbing, electrical, or HVAC changes does require a permit.

How much do building permits cost in Toronto?

Permit fees in Toronto are calculated based on the project type and scope. Typical residential permits range from $198 for small projects (decks, sheds) to $2,000+ for complex projects (secondary suites). The City publishes a fee schedule updated annually.

Get Your Toronto Permit Assessment

Enter your Toronto address and answer a few questions about your project. Get a personalized assessment in under 2 minutes.

Check My Property